vw logo

Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI 5K0941700A

BP31709000C31

£ 57.23
Shipping and VAT are included in the price.
  • Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI | BP31709000C31
    22
    Available
    Left hand drive
warranty icon1 year warranty
No risk icon
Make your order risk free.

Money back guarantee!

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • delivery icon

    Delivery time for this used part is 3 to 5 working days.

  • import duties icon

    Import duties included

Car Details

VW TOURAN (1T1, 1T2) 1.9 TDI
[2003-2010]
(5 Doors)

Reference

5K0941700A |

VIN

WVGZZZ1TZAW103344

Engine Code

BLS

Mileage

99020
warranty icon1 year warranty
No risk icon
Make your order risk free.

Money back guarantee!

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • delivery icon

    Delivery time for this used part is 3 to 5 working days.

  • import duties icon

    Import duties included

Notes

This product does not have any observations

Technical Specifications

Drivetrain

Front-Wheel Drive

Construction type

MPV

Fuel type

Diesel

Engine type

Diesel

Power

105 hp / 77 kw

Brake type

-

No. of cylinders

4

Catalyst type

with diesel oxidation catalytic converter

Displacement (cc)

1896

Brake system

-

No. of valves

8

Transmission

-

More Information

Any additional costs (eg installation, removal, and assembly costs) are the customer's responsibility.

Usually parts always show signs of wear, which is why they are always cheaper than new parts. For body parts slight dents, minor bumps or scratches in the paint are normal, everything else is described by us as accurately as possible. Color specifications are not binding, they may differ despite a color code. The compatibility must always be checked before painting / treatment.
Please be sure to compare the spare part in the picture and the specified OE numbers before buying. Please always compare the part number with that of the old part before you buy to ensure compatibility. Also, small deviations in the part number, e.g. Different index letters at the end have a big impact on the interoperability with your vehicle. If no part number is provided, compatibility should be ensured by comparing product images, the vehicle's application list, the VIN number by consulting specialised dealers.
During the production period of a vehicle series, changes made by the manufacturer to a vehicle flow continuously, so it may happen that an item does not fit into your vehicle despite its compatibility with the specified vehicle. Therefore, please always compare the part number and the product images if possible before you buy.

The right front Fog Light is an automotive component designed to provide additional path lighting in poor visibility conditions. When turning the steering wheel or signaling a curved path, this element illuminates the area corresponding to the path taken. Its function is to improve your vision of potential road hazards in advance. This element is located in the front area of the vehicle on the right and left side respectively.

Right front fog light VW TOURAN (1T1, 1T2) 1.9 TDI is a unique original used part with the reference 5K0941700A | and with the article's id BP31709000C31

Client Evaluation

What people say

  • Christopher Matthews
    The part was well packed and came very fast to the uk
  • Pramod Patil
    Fast and reliable, save €400 as i installed the part by self
  • Neil Lewin
    Great delivery time. Prompt service. Good price. Job sorted.

VW TOURAN (1T1, 1T2) 1.9 TDI Parts

VW

Volkswagen, one of the largest car manufacturers in the world, boasts a rich and diverse history in the automotive industry. Founded in 1937 to create an affordable car for everyone, the German brand quickly became a dominant force in the global market with a wide range of vehicles ranging from compact cars to luxury SUVs.

The brand is renowned for the iconic design of the Volkswagen Beetle, which has become a globally recognized cultural phenomenon. The Volkswagen Polo and the Volkswagen Golf are among the best-selling cars in history, renowned for their versatility, performance, and build quality.

Volkswagen also plays a prominent role in the forefront of electrification, with models like the Volkswagen ID.4, a fully electric SUV, showcasing the brand's commitment to sustainable mobility. If you need Volkswagen used auto parts, you can find them at B-Parts.

Discover over 800,000 used car parts for VW at B-Parts.

At B-Parts, we understand how important reliability is when it comes to used car parts. That’s why every Right front fog light for VW TOURAN (1T1, 1T2) 1.9 TDI, compatible with models from 2003 to 2010, goes through a strict quality control process to ensure it meets the highest standards before being shipped to the customer.

We offer fast and efficient delivery across Europe and the United States, making sure you receive your part as quickly as possible and minimize your vehicle's downtime.

Our online store is designed to provide a simple and intuitive shopping experience. You can easily browse our extensive inventory of auto parts by brand, model, or category to quickly find the VW TOURAN (1T1, 1T2) 1.9 TDI Right front fog light or any other part you need. Our advanced search tools allow you to filter results accurately, ensuring a smooth and hassle-free experience.

Choosing used car parts from B-Parts is also an environmentally conscious decision. By reusing components, you're helping reduce waste and support greater sustainability in the automotive industry. It’s a smart financial choice and a responsible one for the planet.

Our dedicated support team is always ready to help you find the right part for your vehicle and answer any questions you may have. For your peace of mind, we also offer a 12-month warranty, 1-year installation insurance, and a 14-day return policy, ensuring a safe and risk-free buying experience.

With B-Parts, finding the right used Right front fog light for your VW TOURAN (1T1, 1T2) 1.9 TDI is quick, easy, and reliable. Trust the experts in used auto parts and get the best solution for your vehicle with quality, sustainability, and fair pricing.