dacia logo

Starter DACIA SANDERO 1.4 MPI LPG 8200584664 - BP20913216M8

$ 133.31
£ 101.92
Shipping and VAT are included in the price.
$ 133.31
£ 101.92
Shipping and VAT are included in the price.
warranty icon12 Months of Warranty
No risk icon
Make your order risk free.

Return within 14 days with a money-back guarantee.

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • delivery icon

    The estimated delivery time for this used part is 6 to 8 working days.

  • import duties icon

    Import duties included

Car Details

DACIA SANDERO 1.4 MPI LPG
[2009-2026]
(5 Doors)

Reference

8200584664

VIN

UU1BSDMER42636212

Engine Code

K7J 714

Mileage

70855
warranty icon12 Months of Warranty
No risk icon
Make your order risk free.

Return within 14 days with a money-back guarantee.

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • delivery icon

    The estimated delivery time for this used part is 6 to 8 working days.

  • import duties icon

    Import duties included

Notes

JH1/JH3 | White

(This observation was automatically translated to English)

Click here to see the original.

Technical Specifications

Drivetrain

Front-Wheel Drive

Construction type

Hatchback

Fuel type

Petrol/Liquified Petroleum Gas (LPG)

Engine type

Petrol Engine

Power

72 hp / 53 kw

Brake type

-

No. of cylinders

4

Catalyst type

with three-way catalytic converter

Displacement (cc)

1390

Brake system

-

No. of valves

8

Transmission

-

More Information

Installation, assembly and removal costs are not included.

Usually parts always show signs of wear, which is why they are always cheaper than new parts. For body parts slight dents, minor bumps or scratches in the paint are normal, everything else is described by us as accurately as possible. Color specifications are not binding, they may differ despite a color code. The compatibility must always be checked before painting / treatment.
Please be sure to compare the spare part in the picture and the specified OE numbers before buying. Please always compare the part number with that of the old part before you buy to ensure compatibility. Also, small deviations in the part number, e.g. Different index letters at the end have a big impact on the interoperability with your vehicle. If no part number is provided, compatibility should be ensured by comparing product images, the vehicle's application list, the VIN number by consulting specialised dealers.
During the production period of a vehicle series, changes made by the manufacturer to a vehicle flow continuously, so it may happen that an item does not fit into your vehicle despite its compatibility with the specified vehicle. Therefore, please always compare the part number and the product images if possible before you buy.

A starter is a device used to turn an internal combustion engine in order to start engine operation by its own force. Starters can be electrical, pneumatic or hydraulic. The starter engine can also be another internal combustion engine in the case, for example, of very large engines, or diesel engines in agricultural or excavation applications.

Starter DACIA SANDERO 1.4 MPI LPG is a unique original used part with the reference 8200584664 and with the article's id BP20913216M8

Discover 2 used car parts from this vehicle compatible with your car.

car main image
dacia logo
DACIA SANDERO 1.4 MPI LPG[2009-2026]5 Doors
car main image

Client Evaluation

What people say

  • Christopher Matthews
    The part was well packed and came very fast to the uk
  • Pramod Patil
    Fast and reliable, save €400 as i installed the part by self
  • Neil Lewin
    Great delivery time. Prompt service. Good price. Job sorted.
Similar used car parts

DACIA SANDERO 1.4 MPI LPG Parts

DACIA

Dacia is renowned for its economical cars and is an example of how simplicity can be efficient and affordable in the automotive world. Founded in 1966 in Romania as a subsidiary of Renault, the company is one of the best-selling car brands in Europe and is present in over 40 countries.

Dacia offers a wide range of models, from compact sedans like the Dacia Logan, SUVs like the Dacia Duster, practical hatchbacks like the Dacia Sandero, to commercial vehicles like the Dacia Lodgy or Dokker. Dacia combines sophistication and pragmatism, and is a popular choice for those seeking affordable cars.

The company has also been a pioneer in technologies such as electric power steering, cruise control, and satellite navigation systems. If you need Dacia used auto parts, you can find them at B-Parts.

Discover over 200,000 used car parts for DACIA at B-Parts.

B-Parts is your specialist in original used car parts. Every Starter for DACIA SANDERO 1.4 MPI LPG, compatible from 2009 to 2026, goes through strict quality control, with real photos and a 12-month warranty, before reaching the customer.

We offer fast and efficient delivery across Europe, making sure you receive your part as quickly as possible and minimize your vehicle's downtime.

Our online store is designed to provide a simple and intuitive shopping experience. You can easily browse our extensive inventory of auto parts by brand, model, or category to quickly find the DACIA SANDERO 1.4 MPI LPG Starter or any other part you need. Our advanced search tools allow you to filter results accurately, ensuring a smooth and hassle-free experience.

Choosing used car parts from B-Parts is also an environmentally conscious decision. By reusing components, you're helping reduce waste and support greater sustainability in the automotive industry. It’s a smart financial choice and a responsible one for the planet.

Our dedicated support team is always ready to help you find the right part for your vehicle and answer any questions you may have. For your peace of mind, we also offer a 12-month warranty, 1-year installation insurance, and a 14-day return policy, ensuring a safe and risk-free buying experience.

With B-Parts, finding the right used Starter for your DACIA SANDERO 1.4 MPI LPG is quick, easy, and reliable. Trust the experts in used auto parts and get the best solution for your vehicle with quality, sustainability, and fair pricing.