Injector AUDI A5 (8T3) 3.0 TDI quattro 0445115058 - BP38000331M100
Return within 14 days with a money-back guarantee.
Discover our return policyWe accept the main payment methods in Europe
The estimated delivery time for this used part is 5 to 7 working days.
Import duties included
Available Monday to Friday, between 08:30am-12:30pm and 1:30pm-6pm (GMT).
Car Details
AUDI A5 (8T3) 3.0 TDI quattro
[2007-2012] (2 Doors)
Reference
- 0445115058
Grade
- A
VIN
- WAUZZZ8T48A035935
Engine Code
- -
Mileage
- -
Return within 14 days with a money-back guarantee.
Discover our return policyWe accept the main payment methods in Europe
The estimated delivery time for this used part is 5 to 7 working days.
Import duties included
Notes
LO08 Professionally cleaned and checked in the Diesel Systems Workshop Impresja; Part manufacturer: Audi OE |
(This observation was automatically translated to English)
Click here to see the original.Technical Specifications
Drivetrain
- All-wheel Drive
Construction type
- Coupe
Fuel type
- Diesel
Engine type
- Diesel
Power
- 240 hp / 176 kw
Brake type
- -
No. of cylinders
- 6
Catalyst type
- with diesel oxidation catalytic converter
Displacement (cc)
- 2967
Brake system
- -
No. of valves
- 24
Transmission
- -
More Information
Installation, assembly and removal costs are not included.
- Usually parts always show signs of wear, which is why they are always cheaper than new parts. For body parts slight dents, minor bumps or scratches in the paint are normal, everything else is described by us as accurately as possible. Color specifications are not binding, they may differ despite a color code. The compatibility must always be checked before painting / treatment.
- Please be sure to compare the spare part in the picture and the specified OE numbers before buying. Please always compare the part number with that of the old part before you buy to ensure compatibility. Also, small deviations in the part number, e.g. Different index letters at the end have a big impact on the interoperability with your vehicle. If no part number is provided, compatibility should be ensured by comparing product images, the vehicle's application list, the VIN number by consulting specialised dealers.
- During the production period of a vehicle series, changes made by the manufacturer to a vehicle flow continuously, so it may happen that an item does not fit into your vehicle despite its compatibility with the specified vehicle. Therefore, please always compare the part number and the product images if possible before you buy.
The injector is involved in spraying fuel in the vehicle's combustion chamber. This component works with any type of fuel, being used in diesel engines, gasoline or gas. In the case of gasoline and gas equipment, the engine's fuel system remains similar. The operating principle in diesel engines is identical, with the particularity of operating only under high pressure. This element is located in the engine compartment.
Injector AUDI A5 (8T3) 3.0 TDI quattro is a unique original used part with the reference 0445115058 and with the article's id BP38000331M100
Discover 29 used car parts from this vehicle compatible with your car.
Client Evaluation
What people say
Christopher Matthews The part was well packed and came very fast to the uk
Pramod Patil Fast and reliable, save €400 as i installed the part by self
Neil Lewin Great delivery time. Prompt service. Good price. Job sorted.
AUDI A5 (8T3) 3.0 TDI quattro Parts

Audi was founded in 1909 by the German engineer August Horch. The company has undergone several transformations over the years but always remained true to its values of innovation and performance. It pioneered technologies, such as turbocharging, direct fuel injection, and electric steering.
Today, Audi is one of the top three premium car manufacturers. The brand is present in over 100 countries and offers a wide range of models, from compacts to luxury SUVs. Recently, the brand launched its first all-electric SUV, the Audi e-tron.
Best-selling models include the Audi A3 and A3 Sportback, the Audi A4, and the Audi A6. These vehicles are known for their elegant design, sporty performance, and advanced technology. If you need Audi used auto parts, you can find them at B-Parts.

B-Parts is your specialist in original used car parts. Every Injector for AUDI A5 (8T3) 3.0 TDI quattro, compatible from 2007 to 2012, goes through strict quality control, with real photos and a 12-month warranty, before reaching the customer.
We offer fast and efficient delivery across Europe, making sure you receive your part as quickly as possible and minimize your vehicle's downtime.
Our online store is designed to provide a simple and intuitive shopping experience. You can easily browse our extensive inventory of auto parts by brand, model, or category to quickly find the AUDI A5 (8T3) 3.0 TDI quattro Injector or any other part you need. Our advanced search tools allow you to filter results accurately, ensuring a smooth and hassle-free experience.
Choosing used car parts from B-Parts is also an environmentally conscious decision. By reusing components, you're helping reduce waste and support greater sustainability in the automotive industry. It’s a smart financial choice and a responsible one for the planet.
Our dedicated support team is always ready to help you find the right part for your vehicle and answer any questions you may have. For your peace of mind, we also offer a 12-month warranty, 1-year installation insurance, and a 14-day return policy, ensuring a safe and risk-free buying experience.
With B-Parts, finding the right used Injector for your AUDI A5 (8T3) 3.0 TDI quattro is quick, easy, and reliable. Trust the experts in used auto parts and get the best solution for your vehicle with quality, sustainability, and fair pricing.






































