vw logo

Engine VW GOLF V (1K1) 1.9 TDI BKC - BP39294705M1

$ 887.22
£ 662.37
Shipping and VAT are included in the price.
  • Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 1
    Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 2
    Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 3
    Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 4
    Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 5
    Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 6
    Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 7
    Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 8
    Engine VW GOLF V (1K1) 1.9 TDI | BP39294705M1  - Image 9
    9
    Available
    Left hand drive
warranty icon12 Months of Warranty
No risk icon
Make your order risk free.

Return within 14 days with a money-back guarantee.

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • delivery icon

    The estimated delivery time for this used part is 8 to 10 working days.

  • import duties icon

    Import duties included

  • warranty plus icon

    Includes fitting insurance valid for 1 year

Car Details

VW GOLF V (1K1) 1.9 TDI
[2003-2008]
(5 Doors)

Reference

BKC

Grade

A

VIN

WVWZZZ1KZ5W062035

Engine Code

-

Mileage

-
warranty icon12 Months of Warranty
No risk icon
Make your order risk free.

Return within 14 days with a money-back guarantee.

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • delivery icon

    The estimated delivery time for this used part is 8 to 10 working days.

  • import duties icon

    Import duties included

  • warranty plus icon

    Includes fitting insurance valid for 1 year

Notes

Our engines may be photographed with other components, such as turbo, injectors, alternator, A/C compressor, among others. These items are not included in the price. If you need a complete quote, please contact our sales team through our live chat.

Technical Specifications

Drivetrain

Front-Wheel Drive

Construction type

Hatchback

Fuel type

Diesel

Engine type

Diesel

Power

105 hp / 77 kw

Brake type

-

No. of cylinders

4

Catalyst type

with diesel oxidation catalytic converter

Displacement (cc)

1896

Brake system

-

No. of valves

8

Transmission

-

More Information

Installation, assembly and removal costs are not included.

Usually parts always show signs of wear, which is why they are always cheaper than new parts. For body parts slight dents, minor bumps or scratches in the paint are normal, everything else is described by us as accurately as possible. Color specifications are not binding, they may differ despite a color code. The compatibility must always be checked before painting / treatment.
Please be sure to compare the spare part in the picture and the specified OE numbers before buying. Please always compare the part number with that of the old part before you buy to ensure compatibility. Also, small deviations in the part number, e.g. Different index letters at the end have a big impact on the interoperability with your vehicle. If no part number is provided, compatibility should be ensured by comparing product images, the vehicle's application list, the VIN number by consulting specialised dealers.
During the production period of a vehicle series, changes made by the manufacturer to a vehicle flow continuously, so it may happen that an item does not fit into your vehicle despite its compatibility with the specified vehicle. Therefore, please always compare the part number and the product images if possible before you buy.

Responsible for transforming the thermal energy released by the combustion of fuel into mechanical energy, the engine is an indispensable part in the constitution of a car. As a rule, its configuration is carried out in relation to its construction and size. Regarding the design of the engine, more specifically the positioning of the cylinders, we can divide this part into four classifications: Vertical engine, in V, in W and Boxer. Regarding its size, characterized by being the factor that determines the capacity to receive fuel and carry out combustion, we can find engines that have a cylinder capacity of 1.0 to 2.0. The essential components that contribute to its functioning are the cylinders, the spark plug, the injectors and the piston.

Engine VW GOLF V (1K1) 1.9 TDI is a unique original used part with the reference BKC and with the article's id BP39294705M1

Client Evaluation

What people say

  • Christopher Matthews
    The part was well packed and came very fast to the uk
  • Pramod Patil
    Fast and reliable, save €400 as i installed the part by self
  • Neil Lewin
    Great delivery time. Prompt service. Good price. Job sorted.

VW GOLF V (1K1) 1.9 TDI Parts

VW

Volkswagen, one of the largest car manufacturers in the world, boasts a rich and diverse history in the automotive industry. Founded in 1937 to create an affordable car for everyone, the German brand quickly became a dominant force in the global market with a wide range of vehicles ranging from compact cars to luxury SUVs.

The brand is renowned for the iconic design of the Volkswagen Beetle, which has become a globally recognized cultural phenomenon. The Volkswagen Polo and the Volkswagen Golf are among the best-selling cars in history, renowned for their versatility, performance, and build quality.

Volkswagen also plays a prominent role in the forefront of electrification, with models like the Volkswagen ID.4, a fully electric SUV, showcasing the brand's commitment to sustainable mobility. If you need Volkswagen used auto parts, you can find them at B-Parts.

Discover over 1,000,000 used car parts for VW at B-Parts.

B-Parts is your specialist in original used car parts. Every Engine for VW GOLF V (1K1) 1.9 TDI, compatible from 2003 to 2008, goes through strict quality control, with real photos and a 12-month warranty, before reaching the customer.

We offer fast and efficient delivery across Europe, making sure you receive your part as quickly as possible and minimize your vehicle's downtime.

Our online store is designed to provide a simple and intuitive shopping experience. You can easily browse our extensive inventory of auto parts by brand, model, or category to quickly find the VW GOLF V (1K1) 1.9 TDI Engine or any other part you need. Our advanced search tools allow you to filter results accurately, ensuring a smooth and hassle-free experience.

Choosing used car parts from B-Parts is also an environmentally conscious decision. By reusing components, you're helping reduce waste and support greater sustainability in the automotive industry. It’s a smart financial choice and a responsible one for the planet.

Our dedicated support team is always ready to help you find the right part for your vehicle and answer any questions you may have. For your peace of mind, we also offer a 12-month warranty, 1-year installation insurance, and a 14-day return policy, ensuring a safe and risk-free buying experience.

With B-Parts, finding the right used Engine for your VW GOLF V (1K1) 1.9 TDI is quick, easy, and reliable. Trust the experts in used auto parts and get the best solution for your vehicle with quality, sustainability, and fair pricing.