audi logo

Engine AUDI Q3 (F3B) 35 TDI 04L 100 090 R DFG 606267

BP27647644M1

$ 4489.53
€ 3830.00
Shipping included in price, VAT included, if not exempt.
  • Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    Engine AUDI Q3 (F3B) 35 TDI | BP27647644M1
    14
    Available
warranty icon1 year warranty
No risk icon
Make your order risk free.

Money back guarantee!

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • Payment Klarna
  • Payment MB
  • Payment MBway
  • Payment Bancontact
  • Payment EPS
  • Payment iDEAL
  • Payment CB
  • delivery icon

    Delivery time for this used part is 12 to 14 working days.

  • warranty plus icon

    Includes fitting insurance valid for 1 year

Car Details

AUDI Q3 (F3B) 35 TDI
[2018-2025]
(5 Doors)

Reference

04L 100 090 R DFG 606267

VIN

WAUZZZF38L1100412

Engine Code

-

Mileage (KMs)

113622
warranty icon1 year warranty
No risk icon
Make your order risk free.

Money back guarantee!

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • Payment Klarna
  • Payment MB
  • Payment MBway
  • Payment Bancontact
  • Payment EPS
  • Payment iDEAL
  • Payment CB
  • delivery icon

    Delivery time for this used part is 12 to 14 working days.

  • warranty plus icon

    Includes fitting insurance valid for 1 year

Notes

Levas motor: Doble árbol; Color: Negro; Aire acondicionado: si; Alimentacion: Commond rail; Posicion motor: Transversal |

Our engines may be photographed with other components, such as turbo, injectors, alternator, A/C compressor, among others. These items are not included in the price. If you need a complete quote, please contact our sales team through our live chat.

Technical Specifications

Drivetrain

Front-Wheel Drive

Construction type

SUV

Fuel type

Diesel

Engine type

Diesel

Power

150 hp / 110 kw

Brake type

-

No. of cylinders

4

Catalyst type

with diesel oxidation catalytic converter

Displacement (cc)

1968

Brake system

-

No. of valves

16

Transmission

-

More Information

Any additional costs (eg installation, removal, and assembly costs) are the customer's responsibility.

Usually parts always show signs of wear, which is why they are always cheaper than new parts. For body parts slight dents, minor bumps or scratches in the paint are normal, everything else is described by us as accurately as possible. Color specifications are not binding, they may differ despite a color code. The compatibility must always be checked before painting / treatment.
Please be sure to compare the spare part in the picture and the specified OE numbers before buying. Please always compare the part number with that of the old part before you buy to ensure compatibility. Also, small deviations in the part number, e.g. Different index letters at the end have a big impact on the interoperability with your vehicle. If no part number is provided, compatibility should be ensured by comparing product images, the vehicle's application list, the VIN number by consulting specialised dealers.
During the production period of a vehicle series, changes made by the manufacturer to a vehicle flow continuously, so it may happen that an item does not fit into your vehicle despite its compatibility with the specified vehicle. Therefore, please always compare the part number and the product images if possible before you buy.

Responsible for transforming the thermal energy released by the combustion of fuel into mechanical energy, the engine is an indispensable part in the constitution of a car. As a rule, its configuration is carried out in relation to its construction and size. Regarding the design of the engine, more specifically the positioning of the cylinders, we can divide this part into four classifications: Vertical engine, in V, in W and Boxer. Regarding its size, characterized by being the factor that determines the capacity to receive fuel and carry out combustion, we can find engines that have a cylinder capacity of 1.0 to 2.0. The essential components that contribute to its functioning are the cylinders, the spark plug, the injectors and the piston.

Engine AUDI Q3 (F3B) 35 TDI is a unique original used part with the reference 04L 100 090 R DFG 606267 and with the article's id BP27647644M1

Client evaluation

What people say

  • Christopher Matthews
    The part was well packed and came very fast to the uk
  • Pramod Patil
    Fast and reliable, save €400 as i installed the part by self
  • Neil Lewin
    Great delivery time. Prompt service. Good price. Job sorted.

AUDI Q3 (F3B) 35 TDI Parts

AUDI

Audi was founded in 1909 by the German engineer August Horch. The company has undergone several transformations over the years but always remained true to its values of innovation and performance. It pioneered technologies, such as turbocharging, direct fuel injection, and electric steering.

Today, Audi is one of the top three premium car manufacturers. The brand is present in over 100 countries and offers a wide range of models, from compacts to luxury SUVs. Recently, the brand launched its first all-electric SUV, the Audi e-tron.

Best-selling models include the Audi A3 and A3 Sportback, the Audi A4, and the Audi A6. These vehicles are known for their elegant design, sporty performance, and advanced technology. If you need Audi used auto parts, you can find them at B-Parts.

Discover over 500,000 used car parts for AUDI at B-Parts.

At B-Parts, we understand how important reliability is when it comes to used car parts. That’s why every Engine for AUDI Q3 (F3B) 35 TDI, compatible with models from 2018 to 2025, goes through a strict quality control process to ensure it meets the highest standards before being shipped to the customer.

We offer fast and efficient delivery across Europe and the United States, making sure you receive your part as quickly as possible and minimize your vehicle's downtime.

Our online store is designed to provide a simple and intuitive shopping experience. You can easily browse our extensive inventory of auto parts by brand, model, or category to quickly find the AUDI Q3 (F3B) 35 TDI Engine or any other part you need. Our advanced search tools allow you to filter results accurately, ensuring a smooth and hassle-free experience.

Choosing used car parts from B-Parts is also an environmentally conscious decision. By reusing components, you're helping reduce waste and support greater sustainability in the automotive industry. It’s a smart financial choice and a responsible one for the planet.

Our dedicated support team is always ready to help you find the right part for your vehicle and answer any questions you may have. For your peace of mind, we also offer a 12-month warranty, 1-year installation insurance, and a 14-day return policy, ensuring a safe and risk-free buying experience.

With B-Parts, finding the right used Engine for your AUDI Q3 (F3B) 35 TDI is quick, easy, and reliable. Trust the experts in used auto parts and get the best solution for your vehicle with quality, sustainability, and fair pricing.

4.7
Google ReviewsTrustpilot Reviews +20.000Reviews