Instrument cluster TOYOTA YARIS CROSS (MXP_) 1.5 Hybrid (MXPJ11) 83800F5D80 83800F5D80
BP21131095C47
- 6AvailableLeft hand drive
Money back guarantee!
Discover our return policyWe accept the main payment methods in Europe
Delivery time for this used part is 3 to 5 working days.
Import duties included
Car Details
TOYOTA YARIS CROSS (MXP_) 1.5 Hybrid (MXPJ11)
[2024-2025] ( Doors)
Reference
- 83800F5D80 | 83800F5D80
VIN
- JTDKGAGB50A013077
Engine Code
- M15A-FXE
Mileage
- 11
Money back guarantee!
Discover our return policyWe accept the main payment methods in Europe
Delivery time for this used part is 3 to 5 working days.
Import duties included
Notes
MB4573502185
Technical Specifications
Drivetrain
- Front-Wheel Drive
Construction type
- SUV
Fuel type
- Petrol/Electric
Engine type
- Full Hybrid
Power
- 131 hp / 96 kw
Brake type
- -
No. of cylinders
- 3
Catalyst type
- with three-way catalytic converter
Displacement (cc)
- 1490
Brake system
- -
No. of valves
- 12
Transmission
- -
More Information
Any additional costs (eg installation, removal, and assembly costs) are the customer's responsibility.
- Usually parts always show signs of wear, which is why they are always cheaper than new parts. For body parts slight dents, minor bumps or scratches in the paint are normal, everything else is described by us as accurately as possible. Color specifications are not binding, they may differ despite a color code. The compatibility must always be checked before painting / treatment.
- Please be sure to compare the spare part in the picture and the specified OE numbers before buying. Please always compare the part number with that of the old part before you buy to ensure compatibility. Also, small deviations in the part number, e.g. Different index letters at the end have a big impact on the interoperability with your vehicle. If no part number is provided, compatibility should be ensured by comparing product images, the vehicle's application list, the VIN number by consulting specialised dealers.
- During the production period of a vehicle series, changes made by the manufacturer to a vehicle flow continuously, so it may happen that an item does not fit into your vehicle despite its compatibility with the specified vehicle. Therefore, please always compare the part number and the product images if possible before you buy.
Yes, there are important specifications to consider when purchasing Electronic Control Units (ECUs) and other electronic parts through B-Parts.
It's crucial to know that the warranty will be voided if the parts are tampered with or the warranty seals are broken. For this reason, we strongly recommend that these types of parts be installed by qualified professionals. They must have the necessary means and knowledge to program electronic parts without any intervention that could compromise their warranty.
The instrument cluster is a driving aid panel where information about different vehicle systems and devices is displayed. This component has important information for drivers, such as speed, engine temperature, engine revolutions per second and some bad indicators operation. In vehicles in general this element is located under the windshield facing the driver, behind the steering wheel.
Instrument cluster TOYOTA YARIS CROSS (MXP_) 1.5 Hybrid (MXPJ11) is a unique original used part with the reference 83800F5D80 | 83800F5D80 and with the article's id BP21131095C47
Client evaluation
What people say
Christopher Matthews The part was well packed and came very fast to the uk
Pramod Patil Fast and reliable, save €400 as i installed the part by self
Neil Lewin Great delivery time. Prompt service. Good price. Job sorted.
TOYOTA YARIS CROSS (MXP_) 1.5 Hybrid (MXPJ11) Parts

Toyota is one of the largest car manufacturers in the world, widely praised for its reputation for reliability, innovation, and commitment to efficiency. The Japanese brand stands out for building high-quality cars recognized for its distinctive versatility, covering a wide range of segments, from compact cars to family vehicles and SUVs.
Iconic models such as the Toyota Corolla considered the best-selling car in history, and the Toyota Yaris, known for its balance between efficiency and agility, have solidified Toyota's presence in global markets. More recently, models like the Toyota Auris and Toyota RAV4 have continued the brand's tradition of excellence.
Additionally, Toyota has been a leader in hybrid car technologies and remains an influential force in the global automotive industry. If you need Toyota used auto parts, you can find them at B-Parts.

At B-Parts, we understand how important reliability is when it comes to used car parts. That’s why every Instrument cluster for TOYOTA YARIS CROSS (MXP_) 1.5 Hybrid (MXPJ11), compatible with models from 2024 to 2025, goes through a strict quality control process to ensure it meets the highest standards before being shipped to the customer.
We offer fast and efficient delivery across Europe and the United States, making sure you receive your part as quickly as possible and minimize your vehicle's downtime.
Our online store is designed to provide a simple and intuitive shopping experience. You can easily browse our extensive inventory of auto parts by brand, model, or category to quickly find the TOYOTA YARIS CROSS (MXP_) 1.5 Hybrid (MXPJ11) Instrument cluster or any other part you need. Our advanced search tools allow you to filter results accurately, ensuring a smooth and hassle-free experience.
Choosing used car parts from B-Parts is also an environmentally conscious decision. By reusing components, you're helping reduce waste and support greater sustainability in the automotive industry. It’s a smart financial choice and a responsible one for the planet.
Our dedicated support team is always ready to help you find the right part for your vehicle and answer any questions you may have. For your peace of mind, we also offer a 12-month warranty, 1-year installation insurance, and a 14-day return policy, ensuring a safe and risk-free buying experience.
With B-Parts, finding the right used Instrument cluster for your TOYOTA YARIS CROSS (MXP_) 1.5 Hybrid (MXPJ11) is quick, easy, and reliable. Trust the experts in used auto parts and get the best solution for your vehicle with quality, sustainability, and fair pricing.