Climate control VW TOURAN (1T1, 1T2) 1.9 TDI 1K0907044DA VW
BP27231326I5
- 9AvailableLeft hand drive
Money back guarantee!
Discover our return policyWe accept the main payment methods in Europe
Delivery time for this used part is 5 to 7 working days.
Import duties included
Car Details
VW TOURAN (1T1, 1T2) 1.9 TDI
[2003-2010] ( Doors)
Reference
- 1K0907044DA VW
VIN
- WVGZZZ1TZAW116283
Engine Code
- -
Mileage
- 267646
Money back guarantee!
Discover our return policyWe accept the main payment methods in Europe
Delivery time for this used part is 5 to 7 working days.
Import duties included
Notes
VW Touran 1T GP original Klimabedienteil Climatronic 1K0907044DA Heizungsbetätigung Bj 2010 / es handelt sich um gebrauchte Teile mit den alterstypischen Gebrauchsspuren / es wird keine Sachmangelhaftung auf Anbauteile gewährt / beachten Sie die rechtlichen Informationen und unsere AGB |
Technical Specifications
Drivetrain
- Front-Wheel Drive
Construction type
- MPV
Fuel type
- Diesel
Engine type
- Diesel
Power
- 105 hp / 77 kw
Brake type
- -
No. of cylinders
- 4
Catalyst type
- with diesel oxidation catalytic converter
Displacement (cc)
- 1896
Brake system
- -
No. of valves
- 8
Transmission
- -
More Information
Any additional costs (eg installation, removal, and assembly costs) are the customer's responsibility.
Used auto parts
- Usually parts always show signs of wear, which is why they are always cheaper than new parts. For body parts slight dents, minor bumps or scratches in the paint are normal, everything else is described by us as accurately as possible. Color specifications are not binding, they may differ despite a color code. The compatibility must always be checked before painting / treatment.
Compatibility
- Please be sure to compare the spare part in the picture and the specified OE numbers before buying. Please always compare the part number with that of the old part before you buy to ensure compatibility. Also, small deviations in the part number, e.g. Different index letters at the end have a big impact on the interoperability with your vehicle. If no part number is provided, compatibility should be ensured by comparing product images, the vehicle's application list, the VIN number by consulting specialised dealers.
Vehicle application list
- During the production period of a vehicle series, changes made by the manufacturer to a vehicle flow continuously, so it may happen that an item does not fit into your vehicle despite its compatibility with the specified vehicle. Therefore, please always compare the part number and the product images if possible before you buy.
The climate control is a mechanical and electronic component responsible for activating the vehicle's comfort system. Its function is to ensure the vehicle's thermal comfort through the heating system. This element corresponds to a model that activates the entire heating process consisting of several components, from the radiator, evaporator, heating motor, among other elements. This component is part of the vehicle's console controls, therefore, it is located on the dashboard in the center of the vehicle.
Climate control VW TOURAN (1T1, 1T2) 1.9 TDI is a unique original used part with the reference 1K0907044DA VW and with the article's id BP27231326I5
Client evaluation
What people say
Christopher Matthews The part was well packed and came very fast to the uk
Pramod Patil Fast and reliable, save €400 as i installed the part by self
Neil Lewin Great delivery time. Prompt service. Good price. Job sorted.
VW TOURAN (1T1, 1T2) 1.9 TDI Parts

Volkswagen, one of the largest car manufacturers in the world, boasts a rich and diverse history in the automotive industry. Founded in 1937 to create an affordable car for everyone, the German brand quickly became a dominant force in the global market with a wide range of vehicles ranging from compact cars to luxury SUVs.
The brand is renowned for the iconic design of the Volkswagen Beetle, which has become a globally recognized cultural phenomenon. The Volkswagen Polo and the Volkswagen Golf are among the best-selling cars in history, renowned for their versatility, performance, and build quality.
Volkswagen also plays a prominent role in the forefront of electrification, with models like the Volkswagen ID.4, a fully electric SUV, showcasing the brand's commitment to sustainable mobility. If you need Volkswagen used auto parts, you can find them at B-Parts.

At B-Parts, we understand how important reliability is when it comes to used car parts. That’s why every Climate control for VW TOURAN (1T1, 1T2) 1.9 TDI, compatible with models from 2003 to 2010, goes through a strict quality control process to ensure it meets the highest standards before being shipped to the customer.
We offer fast and efficient delivery across Europe and the United States, making sure you receive your part as quickly as possible and minimize your vehicle's downtime.
Our online store is designed to provide a simple and intuitive shopping experience. You can easily browse our extensive inventory of auto parts by brand, model, or category to quickly find the VW TOURAN (1T1, 1T2) 1.9 TDI Climate control or any other part you need. Our advanced search tools allow you to filter results accurately, ensuring a smooth and hassle-free experience.
Choosing used car parts from B-Parts is also an environmentally conscious decision. By reusing components, you're helping reduce waste and support greater sustainability in the automotive industry. It’s a smart financial choice and a responsible one for the planet.
Our dedicated support team is always ready to help you find the right part for your vehicle and answer any questions you may have. For your peace of mind, we also offer a 12-month warranty, 1-year installation insurance, and a 14-day return policy, ensuring a safe and risk-free buying experience.
With B-Parts, finding the right used Climate control for your VW TOURAN (1T1, 1T2) 1.9 TDI is quick, easy, and reliable. Trust the experts in used auto parts and get the best solution for your vehicle with quality, sustainability, and fair pricing.