Home
Brands
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_) 1.2 PureTech 130 (USHNS, URHNS) (130 hp) [2019-2025]
Used Car Parts Catalog
Body Parts
Wheel arch
Your car
PEUGEOT 2008 II (UD_, US_, UY_, UJ_, UR_, UC_) 1.2 PureTech 130 (USHNS, URHNS) (130 hp)
Parts
Airbags
222
Body Parts
3,403
Electrical and Electronic
696
Interior
2,707
Lights
683
Engine & Transmission
690
Not identified
265
Sets
2
Suspension
189
30kg+
Read more about
CO₂
savings
Reference
-
138 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
3
Left hand drive
BP29225686C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
9832023580
5
HNS (EB2ADTS)
6217
£ 129.18
Shipping and VAT
are
included
in the price.
5 to 7 working days
2
Left hand drive
BP29225695C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.5 BlueHDI 130 (131 hp)
[2019-2025]
9832023580
5
YHZ (DV5RC)
69491
£ 129.18
Shipping and VAT
are
included
in the price.
5 to 7 working days
3
Left hand drive
BP16758107C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
9832023480
5
HNS (EB2ADTS)
37303
£ 130.24
Shipping and VAT
are
included
in the price.
5 to 7 working days
3
Left hand drive
BP16758112C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
9832023580
5
HNS (EB2ADTS)
37303
£ 130.24
Shipping and VAT
are
included
in the price.
5 to 7 working days
15
Left hand drive
BP18182176C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.5 BlueHDI 130 (131 hp)
[2019-2025]
9832023480
5
YHZ (DV5RC)
11817
£ 130.24
Shipping and VAT
are
included
in the price.
5 to 7 working days
15
Left hand drive
BP18182177C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.5 BlueHDI 130 (131 hp)
[2019-2025]
9832023580
5
YHZ (DV5RC)
11817
£ 130.24
Shipping and VAT
are
included
in the price.
5 to 7 working days
5
Left hand drive
BP25056553C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_) [2019-2025]
[2019-2025]
9832023480
5
-
43451
£ 130.24
Shipping and VAT
are
included
in the price.
5 to 7 working days
22
Left hand drive
BP27344986C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
9862597580
5
HNS (EB2ADTS)
1828
£ 130.24
Shipping and VAT
are
included
in the price.
5 to 7 working days
3
Left hand drive
BP29137076C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
9832023480
5
HNS (EB2ADTS)
18743
£ 130.24
Shipping and VAT
are
included
in the price.
5 to 7 working days
2
Left hand drive
BP28347118C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
9832023480
5
HNS (EB2ADTS)
67985
£ 131.30
Shipping and VAT
are
included
in the price.
5 to 7 working days
2
Left hand drive
BP30020548C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
9832023480
5
HNS (EB2ADTS)
98362
£ 131.30
Shipping and VAT
are
included
in the price.
5 to 7 working days
9
Left hand drive
BP16728334C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_) [2019-2025]
[2019-2025]
-
-
£ 130.59
Shipping and VAT
are
included
in the price.
3 to 5 working days
2
Left hand drive
BP28256356C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.5 BlueHDI 100 (102 hp)
[2019-2025]
9832023480 | 9832023480 |
5
YHY (DV5RD)
50382
£ 132.36
Shipping and VAT
are
included
in the price.
5 to 7 working days
13
Left hand drive
BP29592855C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
967881368A | 967881368A | 967881368A
5
-
-
£ 130.59
Shipping and VAT
are
included
in the price.
3 to 5 working days
13
Left hand drive
BP29592856C56
Wheel arch
PEUGEOT
2008 II (UD_, US_, UY_, UJ_, UR_, UC_)
1.2 PureTech 130 (USHNS, URHNS) (130 hp)
[2019-2025]
967881378A | 967881378A | 967881378A
5
-
-
£ 130.59
Shipping and VAT
are
included
in the price.
3 to 5 working days
2
3
4
5
6
30kg+
Read more about
CO₂
savings