lancia logo

Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) MANUAL

BP15959552C26

£ 78.50
Shipping and VAT are included in the price.
  • Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) | BP15959552C26
    18
    Available
    Left hand drive
warranty icon1 year warranty
No risk icon
Make your order risk free.

Money back guarantee!

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • delivery icon

    Delivery time for this used part is 2 to 4 working days.

  • import duties icon

    Import duties included

Car Details

LANCIA YPSILON (843_) 1.2 (843.AXB1A)
[2003-2011]
(3 Doors)

Reference

MANUAL |

VIN

ZLA84300003007957

Engine Code

188 A5.000

Mileage

-
warranty icon1 year warranty
No risk icon
Make your order risk free.

Money back guarantee!

Discover our return policy
payment methods icon

We accept the main payment methods in Europe

  • Payment Visa
  • Payment Mastercard
  • Payment Paypal
  • Bank Transfer
  • delivery icon

    Delivery time for this used part is 2 to 4 working days.

  • import duties icon

    Import duties included

Notes

This product does not have any observations

Technical Specifications

Drivetrain

Front-Wheel Drive

Construction type

Hatchback

Fuel type

Petrol

Engine type

Petrol Engine

Power

80 hp / 59 kw

Brake type

-

No. of cylinders

4

Catalyst type

with three-way catalytic converter

Displacement (cc)

1242

Brake system

-

No. of valves

16

Transmission

-

More Information

Any additional costs (eg installation, removal, and assembly costs) are the customer's responsibility.

Usually parts always show signs of wear, which is why they are always cheaper than new parts. For body parts slight dents, minor bumps or scratches in the paint are normal, everything else is described by us as accurately as possible. Color specifications are not binding, they may differ despite a color code. The compatibility must always be checked before painting / treatment.
Please be sure to compare the spare part in the picture and the specified OE numbers before buying. Please always compare the part number with that of the old part before you buy to ensure compatibility. Also, small deviations in the part number, e.g. Different index letters at the end have a big impact on the interoperability with your vehicle. If no part number is provided, compatibility should be ensured by comparing product images, the vehicle's application list, the VIN number by consulting specialised dealers.
During the production period of a vehicle series, changes made by the manufacturer to a vehicle flow continuously, so it may happen that an item does not fit into your vehicle despite its compatibility with the specified vehicle. Therefore, please always compare the part number and the product images if possible before you buy.

Yes, when purchasing a rearview mirror from B-Parts, it's important to consider the following aspects:

For the same vehicle model, there might be several types of rearview mirrors that look identical but have different functionalities. For instance, they might feature electric folding, mirror heating, integrated cameras, among other options.

To verify compatibility, you should confirm the number of pins or wires in the connector of your vehicle's rearview mirror. The mirror you purchase from B-Parts must have the same number of pins or wires to ensure correct operation.

The mirrors themselves (the glass part) are not included in the part's warranty. If they are sent, they are considered courtesy accessories.

The rear view mirrors are located on the outside and in the center of the front window inside the car. They are responsible for assisting the driver's visibility in areas outside his peripheral vision, contributing to the direction of positioning on the road, for carrying out a safe overtaking and for carrying out parking and reverse maneuvers. They are made up of mirrors that have manual or remote adjustment, vertical and horizontal, in order to provide an adequate field of vision for drivers of different heights and positions.

Left mirror LANCIA YPSILON (843_) 1.2 (843.AXB1A) is a unique original used part with the reference MANUAL | and with the article's id BP15959552C26

Client evaluation

What people say

  • Christopher Matthews
    The part was well packed and came very fast to the uk
  • Pramod Patil
    Fast and reliable, save €400 as i installed the part by self
  • Neil Lewin
    Great delivery time. Prompt service. Good price. Job sorted.

LANCIA YPSILON (843_) 1.2 (843.AXB1A) Parts

LANCIA

Lancia is one of the oldest car brands, founded in Italy in 1906. The manufacturer has a century-long history of producing elegant, high-performance automobiles.

The legacy of Lancia extends beyond its role as a car manufacturer. The brand still holds the record for the most titles in the World Rally Championship (WRC) despite not participating since 1992. The Lancia Delta is the brand's most legendary model, known for its exceptional performance.

Lancia also stands out for its innovative approach. The Lancia Thema, for example, was one of the first sedans to feature four-wheel drive and an automatic transmission. The brand's most recognized models include the Lancia Ypsilon, the Lancia Musa, and the Lancia Phedra. If you need Lancia used auto parts, you can find them at B-Parts.

Discover over 30,000 used car parts for LANCIA at B-Parts.

At B-Parts, we understand how important reliability is when it comes to used car parts. That’s why every Left mirror for LANCIA YPSILON (843_) 1.2 (843.AXB1A), compatible with models from 2003 to 2011, goes through a strict quality control process to ensure it meets the highest standards before being shipped to the customer.

We offer fast and efficient delivery across Europe and the United States, making sure you receive your part as quickly as possible and minimize your vehicle's downtime.

Our online store is designed to provide a simple and intuitive shopping experience. You can easily browse our extensive inventory of auto parts by brand, model, or category to quickly find the LANCIA YPSILON (843_) 1.2 (843.AXB1A) Left mirror or any other part you need. Our advanced search tools allow you to filter results accurately, ensuring a smooth and hassle-free experience.

Choosing used car parts from B-Parts is also an environmentally conscious decision. By reusing components, you're helping reduce waste and support greater sustainability in the automotive industry. It’s a smart financial choice and a responsible one for the planet.

Our dedicated support team is always ready to help you find the right part for your vehicle and answer any questions you may have. For your peace of mind, we also offer a 12-month warranty, 1-year installation insurance, and a 14-day return policy, ensuring a safe and risk-free buying experience.

With B-Parts, finding the right used Left mirror for your LANCIA YPSILON (843_) 1.2 (843.AXB1A) is quick, easy, and reliable. Trust the experts in used auto parts and get the best solution for your vehicle with quality, sustainability, and fair pricing.

4.7
Google ReviewsTrustpilot Reviews +20.000Reviews