Home
Brands
SAAB
9-5 (YS3E) 2.3 t (185 hp) [2001-2009]
Used Car Parts Catalog
Body Parts
Left front door
Your car
SAAB 9-5 (YS3E) 2.3 t (185 hp)
Parts
Airbags
85
Body Parts
958
Electrical and Electronic
71
Interior
852
Lights
541
Engine & Transmission
104
Not identified
15
Suspension
31
Sets
30kg+
Read more about
CO₂
savings
Reference
-
24 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
9
Left hand drive
BP29306570C2
Left front door
SAAB
9-5 (YS3E)
2.2 TiD (120 hp)
[2002-2009]
5513502 |
4
D223L
169260
£ 252.12
Shipping and VAT
are
included
in the price.
6 to 8 working days
29
Left hand drive
BP24548984C2
Left front door
SAAB
9-5 (YS3E)
1.9 TiD (150 hp)
[2006-2009]
5513502
4
Z 19 DTH
103259
£ 289.76
Shipping and VAT
are
included
in the price.
8 to 10 working days
2
Left hand drive
BP22000610C2
Left front door
SAAB
9-5 (YS3E)
3.0 TiD (177 hp)
[2001-2005]
5513502
4
D308L
-
£ 291.85
Shipping and VAT
are
included
in the price.
9 to 11 working days
9
Left hand drive
BP23471700C2
Left front door
SAAB
9-5 (YS3E) [1997-2009]
[1997-2009]
azul
5
-
-
£ 312.14
Shipping and VAT
are
included
in the price.
5 to 7 working days
2
Left hand drive
BP9014136C2
Left front door
SAAB
9-5 (YS3E)
2.0 t (150 hp)
[1997-2009]
5513502
4
B205E
138138
£ 306.42
Shipping and VAT
are
included
in the price.
8 to 10 working days
6
Left hand drive
BP28406804C2
Left front door
SAAB
9-5 (YS3E)
2.0 t BioPower (150 hp)
[2005-2009]
5513502
4
B205E
160535
£ 317.87
Shipping and VAT
are
included
in the price.
8 to 10 working days
3
Left hand drive
BP24656751C2
Left front door
SAAB
9-5 (YS3E)
1.9 TiD (150 hp)
[2006-2009]
4
Z 19 DTH
168563
£ 332.96
Shipping and VAT
are
included
in the price.
8 to 10 working days
20
Left hand drive
BP25533010C2
Left front door
SAAB
9-5 (YS3E)
1.9 TiD (150 hp)
[2006-2009]
5513502
4
Z 19 DTH
78407
£ 332.44
Shipping and VAT
are
included
in the price.
8 to 10 working days
5
Left hand drive
BP27549288C2
Left front door
SAAB
9-5 (YS3E)
1.9 TiD (150 hp)
[2006-2009]
5513502
4
Z 19 DTH
111224
£ 343.88
Shipping and VAT
are
included
in the price.
9 to 11 working days
1
2
30kg+
Read more about
CO₂
savings