Home
Brands
SSANGYONG
REXTON / REXTON II (GAB_) 2.7 Xdi Turbo 4x4 (180 hp) [2008-2025]
Used Car Parts Catalog
Interior
Gear lever
Your car
SSANGYONG REXTON / REXTON II (GAB_) 2.7 Xdi Turbo 4x4 (180 hp)
Parts
Airbags
203
Body Parts
1,509
Electrical and Electronic
6
Interior
1,460
Lights
321
Engine & Transmission
9
Suspension
3
Not identified
Sets
Reference
-
8 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
51
Left hand drive
BP17432672M90
Gear lever
SSANGYONG
REXTON / REXTON II (GAB_)
2.7 Xdi (163 hp)
[2004-2025]
3183008012 | 3183008012 |
5
D27DT
-
£ 94.31
Shipping and VAT
are
included
in the price.
2 to 4 working days
8
Left hand drive
BP7429196M90
Gear lever
SSANGYONG
REXTON / REXTON II (GAB_) [2002-2025]
[2002-2025]
-
226103
£ 98.50
Shipping and VAT
are
included
in the price.
2 to 4 working days
19
Left hand drive
BP23395082M90
Gear lever
SSANGYONG
REXTON / REXTON II (GAB_) [2002-2025]
[2002-2025]
5
-
-
£ 98.50
Shipping and VAT
are
included
in the price.
2 to 4 working days
21
Left hand drive
BP29194963M90
Gear lever
SSANGYONG
REXTON / REXTON II (GAB_)
2.7 Xdi (165 hp)
[2005-2006]
5
D27DT
101082
£ 111.07
Shipping and VAT
are
included
in the price.
2 to 4 working days
11
Left hand drive
BP27670967M90
Gear lever
SSANGYONG
REXTON / REXTON II (GAB_)
2.7 Xdi (163 hp)
[2004-2025]
8838008900 |
5
D27DT
-
£ 112.12
Shipping and VAT
are
included
in the price.
2 to 4 working days
11
Left hand drive
BP24478638M90
Gear lever
SSANGYONG
REXTON / REXTON II (GAB_)
2.9 TD (120 hp)
[2002-2006]
8838008900 |
5
OM 662.925
74605
£ 132.03
Shipping and VAT
are
included
in the price.
2 to 4 working days
14
Left hand drive
BP19919497M90
Gear lever
SSANGYONG
REXTON / REXTON II (GAB_)
3.2 RX320 4x4 (220 hp)
[2002-2025]
3670008062
5
-
-
£ 143.55
Shipping and VAT
are
included
in the price.
2 to 4 working days
8
Left hand drive
BP27855544M90
Gear lever
SSANGYONG
REXTON / REXTON II (GAB_)
2.7 Xdi (163 hp)
[2004-2025]
PP210267079 | A2105451632 | PP170267054 |
5
D27DT
-
£ 233.67
Shipping and VAT
are
included
in the price.
2 to 4 working days