Home
Brands
VW
CRAFTER 30-50 Van (2E_) 2.0 TDI (109 hp) [2011-2016]
Used Car Parts Catalog
Engine & Transmission
Throttle body
Your car
VW CRAFTER 30-50 Van (2E_) 2.0 TDI (109 hp)
Parts
Airbags
66
Body Parts
1,131
Electrical and Electronic
137
Interior
760
Lights
140
Engine & Transmission
207
Not identified
89
Sets
1
Suspension
57
Reference
-
8 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
4
BP12037996M82
Throttle body
VW
CRAFTER 30-50 Van (2E_)
2.0 TDI (109 hp)
[2011-2016]
03L128063S | 03L128063H
2
CSLA
281322
$ 125.79
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
3
BP15327482M82
Throttle body
VW
CRAFTER 30-50 Van (2E_)
2.0 TDI (109 hp)
[2011-2016]
03L128063S
2
CSLA
-
$ 132.75
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
29
BP9670903M82
Throttle body
VW
CRAFTER 30-50 Van (2E_)
2.0 TDI (109 hp)
[2011-2016]
03L128063S | A2C32356700
4
-
20809
$ 146.66
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
5
Right hand drive
BP14799843M82
Throttle body
VW
CRAFTER 30-50 Van (2E_)
2.0 TDI (109 hp)
[2011-2016]
03L128063S
-
-
$ 155.94
Shipping included
in price, VAT included,
if not exempt
.
4 to 6 working days
5
BP9507438M82
Throttle body
VW
CRAFTER 30-50 Van (2E_)
2.0 TDI (109 hp)
[2011-2016]
A2C32356700 |
4
-
-
$ 162.90
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
4
BP12478837M82
Throttle body
VW
CRAFTER 30-50 Van (2E_)
2.0 TDI (109 hp)
[2011-2016]
03L128063 | 03L128063SV100 | A2C32356700
2
CSLA
127638
$ 166.37
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
7
BP16512926M82
Throttle body
VW
CRAFTER 30-50 Van (2E_)
2.0 TDI (109 hp)
[2011-2016]
076128063A |
4
BJK
-
$ 166.37
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days
4
BP5023301M82
Throttle body
VW
CRAFTER 30-50 Van (2E_)
2.0 TDI (109 hp)
[2011-2016]
03L128063S | A2C32356700 | 03L128063SV100
-
-
$ 176.81
Shipping included
in price, VAT included,
if not exempt
.
5 to 7 working days