Home
Brands
SUZUKI
VITARA Cabrio (ET, TA)
Used Car Parts Catalog
Engine & Transmission
Front differential
Your car
SUZUKI VITARA Cabrio (ET, TA)
Parts
Airbags
4
Body Parts
166
Electrical and Electronic
38
Interior
36
Lights
32
Engine & Transmission
99
Not identified
41
Suspension
29
Sets
30kg+
Read more about
CO₂
savings
Reference
-
8 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
2
Left hand drive
BP7899118M23
Front differential
SUZUKI
VITARA Cabrio (ET, TA)
1.6 (TA01, SE416) (80 hp)
[1988-1995]
3
G16A (8V)
-
£ 293.58
Shipping and VAT
are
included
in the price.
7 to 9 working days
5
Left hand drive
BP7935563M23
Front differential
SUZUKI
VITARA Cabrio (ET, TA)
1.6 (TA01, SE416) (80 hp)
[1988-1995]
2
G16A (8V)
95743
£ 319.61
Shipping and VAT
are
included
in the price.
7 to 9 working days
28
Left hand drive
BP16120981M23
Front differential
SUZUKI
VITARA Cabrio (ET, TA)
1.6 (TA01, SE416) (80 hp)
[1988-1995]
| R: 5.10
3
G16A (8V)
31900
£ 346.69
Shipping and VAT
are
included
in the price.
6 to 8 working days
9
Left hand drive
BP19509307M23
Front differential
SUZUKI
VITARA Cabrio (ET, TA)
1.9 D (SE419TD) (75 hp)
[1996-1999]
DIANTEIRO
3
-
-
£ 360.05
Shipping and VAT
are
included
in the price.
5 to 7 working days
6
Left hand drive
BP22322263M23
Front differential
SUZUKI
VITARA Cabrio (ET, TA)
1.6 (TA01, SE416) (80 hp)
[1988-1995]
2
G16A (8V)
110664
£ 390.42
Shipping and VAT
are
included
in the price.
7 to 9 working days
4
Left hand drive
BP15152195M23
Front differential
SUZUKI
VITARA Cabrio (ET, TA)
1.6 (TA01, SE416) (80 hp)
[1988-1995]
G16A (8V)
-
£ 462.62
Shipping and VAT
are
included
in the price.
9 to 11 working days
16
Left hand drive
BP22754745M23
Front differential
SUZUKI
VITARA Cabrio (ET, TA)
1.6 (TA01, SE416) (80 hp)
[1988-1995]
G16A (8V)
-
£ 462.62
Shipping and VAT
are
included
in the price.
9 to 11 working days
4
Left hand drive
BP31542984M23
Front differential
SUZUKI
VITARA Cabrio (ET, TA)
1.9 D (SE419TD) (75 hp)
[1996-1999]
358854
5
XUD9SD
-
£ 672.63
Shipping and VAT
are
included
in the price.
7 to 9 working days
30kg+
Read more about
CO₂
savings