Home
Brands
OPEL
ASTRA H GTC (A04) 1.7 CDTI (L08) (125 hp) [2007-2010]
Used Car Parts Catalog
Electrical and Electronic
AC compressor
Your car
OPEL ASTRA H GTC (A04) 1.7 CDTI (L08) (125 hp)
Parts
Airbags
260
Body Parts
2,448
Electrical and Electronic
97
Interior
1,515
Lights
781
Engine & Transmission
102
Not identified
15
Suspension
9
Sets
Reference
-
9 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
9
Left hand drive
BP21296383M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
95517235
3
-
83486
£ 156.34
Shipping and VAT
are
included
in the price.
5 to 7 working days
2
Left hand drive
BP18368791M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
13297443
-
-
£ 189.42
Shipping and VAT
are
included
in the price.
3 to 5 working days
13
Left hand drive
BP23814358M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
95517235
3
-
-
£ 187.84
Shipping and VAT
are
included
in the price.
5 to 7 working days
5
Left hand drive
BP19976796M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
95517235
3
-
125611
£ 199.39
Shipping and VAT
are
included
in the price.
5 to 7 working days
10
Left hand drive
BP19650931M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
13286086
3
Z 17 DTR
-
£ 209.36
Shipping and VAT
are
included
in the price.
3 to 5 working days
7
Left hand drive
BP21307428M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
95517235
3
-
7
£ 210.94
Shipping and VAT
are
included
in the price.
5 to 7 working days
7
Left hand drive
BP25679068M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
95515264
3
-
193352
£ 210.94
Shipping and VAT
are
included
in the price.
5 to 7 working days
3
Left hand drive
BP9592875M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
95516514
3
-
80822
£ 239.29
Shipping and VAT
are
included
in the price.
5 to 7 working days
4
Left hand drive
BP21721919M34
AC compressor
OPEL
ASTRA H GTC (A04)
1.7 CDTI (L08) (125 hp)
[2007-2010]
95515264
3
-
111359
£ 282.33
Shipping and VAT
are
included
in the price.
5 to 7 working days