Home
Brands
MERCEDES-BENZ
CLC-CLASS (CL203) CLC 220 CDI (203.708) (136 hp) [2008-2011]
Used Car Parts Catalog
Body Parts
Front left exterior door handle
Your car
MERCEDES-BENZ CLC-CLASS (CL203) CLC 220 CDI (203.708) (136 hp)
Parts
Airbags
54
Body Parts
373
Interior
326
Lights
166
Not identified
3
Electrical and Electronic
Engine & Transmission
Sets
Suspension
20kg+
Read more about
CO₂
savings
Reference
-
7 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
11
Left hand drive
BP13311269C128
Front left exterior door handle
MERCEDES-BENZ
CLC-CLASS (CL203)
CLC 200 CDI (203.707) (122 hp)
[2008-2011]
2117601970 |
3
OM 646.962
-
£ 39.69
Shipping and VAT
are
included
in the price.
2 to 4 working days
9
Left hand drive
BP6988478C128
Front left exterior door handle
MERCEDES-BENZ
CLC-CLASS (CL203)
CLC 220 CDI (203.708) (150 hp)
[2008-2011]
2037600134
3
OM 646.963
75177
£ 46.98
Shipping and VAT
are
included
in the price.
2 to 4 working days
6
Left hand drive
BP7164442C128
Front left exterior door handle
MERCEDES-BENZ
CLC-CLASS (CL203) [2008-2011]
[2008-2011]
3
-
83931
£ 54.28
Shipping and VAT
are
included
in the price.
2 to 4 working days
10
Left hand drive
BP4973292C128
Front left exterior door handle
MERCEDES-BENZ
CLC-CLASS (CL203) [2008-2011]
[2008-2011]
A21176015709650
3
-
-
£ 57.40
Shipping and VAT
are
included
in the price.
2 to 4 working days
0
Left hand drive
BP7158852C128
Front left exterior door handle
MERCEDES-BENZ
CLC-CLASS (CL203)
CLC 220 CDI (203.708) (150 hp)
[2008-2011]
2037600134
3
OM 646.963
84765
£ 57.40
Shipping and VAT
are
included
in the price.
2 to 4 working days
10
Left hand drive
BP29483711C128
Front left exterior door handle
MERCEDES-BENZ
CLC-CLASS (CL203)
CLC 200 CDI (203.707) (122 hp)
[2008-2011]
3
OM 646.962
-
£ 58.44
Shipping and VAT
are
included
in the price.
2 to 4 working days
5
Left hand drive
BP6242310C128
Front left exterior door handle
MERCEDES-BENZ
CLC-CLASS (CL203)
CLC 220 CDI (203.708) (150 hp)
[2008-2011]
3
-
-
£ 96.13
Shipping and VAT
are
included
in the price.
2 to 4 working days
20kg+
Read more about
CO₂
savings