Home
Brands
MERCEDES-BENZ
GLC (X253)
Used Car Parts Catalog
Airbags
Front right belt tensioner
Your car
MERCEDES-BENZ GLC (X253)
Parts
Airbags
70
Body Parts
1,285
Electrical and Electronic
2,073
Interior
1,210
Lights
146
Engine & Transmission
1,792
Not identified
728
Sets
5
Suspension
687
30kg+
Read more about
CO₂
savings
Reference
-
7 Results
Recommended
Price () Ascending
Price () Descending
New
Fast delivery
17
Left hand drive
BP27988457C88
Front right belt tensioner
MERCEDES-BENZ
GLC (X253)
250 d 4-matic (253.909) (204 hp)
[2015-2019]
622765800 | A20586002859C94 |
5
OM 651.921
-
£ 108.09
Shipping and VAT
are
included
in the price.
2 to 4 working days
16
Left hand drive
BP25291284C88
Front right belt tensioner
MERCEDES-BENZ
GLC (X253)
220 d 4-matic (253.905, 253.903) (170 hp)
[2015-2019]
A2539060300 | A2539060300
5
OM 651.921
87661
£ 122.77
Shipping and VAT
are
included
in the price.
2 to 4 working days
25
Left hand drive
BP20080802C88
Front right belt tensioner
MERCEDES-BENZ
GLC (X253)
250 d 4-matic (253.909) (204 hp)
[2015-2019]
A2058600285
4
OM 651.921
129548
£ 132.56
Shipping and VAT
are
included
in the price.
5 to 7 working days
12
Left hand drive
BP29057711C88
Front right belt tensioner
MERCEDES-BENZ
GLC (X253)
250 d 4-matic (253.909) (204 hp)
[2015-2019]
20586064008R93
5
OM 651.921
74751
£ 208.84
Shipping and VAT
are
included
in the price.
5 to 7 working days
5
Left hand drive
BP11345864C88
Front right belt tensioner
MERCEDES-BENZ
GLC (X253)
AMG 43 4-matic (253.964) (367 hp)
[2016-2019]
A20586002853D53
5
M 276.823
62675
£ 210.94
Shipping and VAT
are
included
in the price.
5 to 7 working days
5
Left hand drive
BP24271531C88
Front right belt tensioner
MERCEDES-BENZ
GLC (X253)
300 de 4-matic (253.911) (306 hp)
[2020-2022]
5
OM 654.920
31376
£ 220.37
Shipping and VAT
are
included
in the price.
5 to 7 working days
14
Left hand drive
BP24624763C88
Front right belt tensioner
MERCEDES-BENZ
GLC (X253)
400 d 4-matic (253.923) (330 hp)
[2019-2022]
A1678603502
4
OM 656.929
17203
£ 385.26
Shipping and VAT
are
included
in the price.
5 to 7 working days
30kg+
Read more about
CO₂
savings